Slant_fin EC-10 Assembly Instructions Manual do Utilizador Página 6

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 12
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 5
6
85
75
N
023
B
1
4
5
6
3
6
2
1
4
7
8
8575N024
9
10
10
7
8
- Put the rear cross bar into place on the lugs of the rear
section facing the outside of the boiler positioning it on:
• the assembly rod ,
• the rear section positioning pin .
- Fix on the rear section with 1 HM8 x 30 screw + 2
flanged nuts .
Installing the control panel support cross bar
- Put the support cross bar into place on the boiler body,
positioning it on :
• the M8 studs at the front,
• the assembly rod and the 3rd section positioning pin
- Fix it at the front with 2 HM8 flanged nuts .
- Fix the 3rd section with :
• 1 HM8 x 30 screw + flanged nuts ,
• 1 flanged nut on the assembly rod.
Assembling the back cross bar (EC-15/16)
Only on 5 and 6 section boilers
EC-13
EC-14
EC-15
EC-16
Vista de página 5
1 2 3 4 5 6 7 8 9 10 11 12

Comentários a estes Manuais

Sem comentários